PLUMBLINE · SEED DESIGN SYSTEM · LIVE SPEC

Plumbline.

The bespoke UX standard for SEED. Same palette, same fonts, same primitives as the original system — re-engineered to instrument grade. This page is the live spec; every component below is the real component.

View LandingBrowse Components
01 — COLOR

Brand · preserved exact

SEED Primary
#0EA5E9
SEED Secondary
#14B8A6
SEED Accent
#06B6D4
SEED Dark
#0F172A

Slate scale

Slate 950
#060B17· Page base
Slate 900
#0F172A· Original SEED dark
Slate 850
#131C32
Slate 800
#1A2540· Panel surface
Slate 700
#273350
Slate 500
#5A6585
Slate 400
#828DAB· Captions
Slate 300
#B0B9CD· Body
Slate 100
#EDEFF5· Headlines

Tricolor

Status Green
#22C55E· ON TRACK
Status Yellow
#EAB308· ATTENTION
Status Red
#EF4444· CRITICAL
02 — TYPOGRAPHY

Manrope · Inter · IBM Plex Mono

MANROPE 200 · 196

Build, with a plumbline.

MANROPE 400 · 48

One platform. Four stakeholders.

MANROPE 500 · 32

The Tricolor Status System

INTER 19 · 400

Four interconnected applications, one intelligence layer. Built for the architects, builders, and clients shaping the country’s most considered residential work.

INTER 15 · 400

Body copy at fifteen pixels with line-height 1.65. Slate-300 over slate-950 — high contrast without going pure white.

PLEX MONO 11 · 0.16em
SEED · CONSTRUCTION INTELLIGENCE · VOL.II
PLEX MONO 12 · 0.04em
PROJECT-04A · 12,400 SF · ASPEN, CO · NTM $24.6M
03 — SURFACES

Panel · Console · Plate

№ 01

Panel

Default surface. Translucent slate over backdrop blur. Used for content cards and voice tiles.

<Panel>
№ 02

Console

Elevated. Deeper blur, brighter hairline, inset highlight + drop shadow. Hero panels, primary instrument modules.

<Console>
№ 03

Plate

Deep-engraved. Slate-950 base, optional registration corners. Diagnostic stations and Tricolor displays.

<Plate registration>
04 — TRICOLOR · DIAGNOSTIC STATIONS

Domain primitive, instrument-grade rendering

ON TRACK

Aspen Residence № 04

Schedule, budget, and quality all within tolerance.

Budget97.2% on plan
Schedule+2 days ahead
Quality0 open
ATTENTION

Hilltop Estate № 11

Stakeholder decision required. Schedule remains green.

Budget104.1%
ScheduleOn plan
AwaitingOwner approval
CRITICAL

Cliffside Build № 02

Blocking issue. Project-wide notification dispatched.

Budget118.6%
Schedule−14 days
Quality3 open
05 — COMPONENTS

Atoms

<Button variant="primary">

Primary

<Button variant="ghost">

Ghost

<Button variant="diagnostic">

Diagnostic

<Tag>

Spec Tag

Tricolor DashboardV3 AssessmentsVoice CommandsFPMS
<TricolorIndicator>

Indicator

SYS · NOMINAL
<Metric>

Metric

$2.4B
Active build value
06 — VOICE

Voice-first, instrument-grade

LISTENING · NLU MODEL v2.3 · LATENCY 142MS
Status
Show me Aspen 04 status
⌘ + 1
Financial
What's the burn rate on Hilltop?
⌘ + 2
CAD
Open the master kitchen elevation
⌘ + 3
Agreement
Approve the change order for tile
⌘ + 4
07 — LIVE CONSOLE

Real-time platform readout pattern

LIVE PLATFORM STATUS
SYS · NOMINAL
Active Build Value
$2.4B
Residences in Design
147
Builders & Architects
38
States Represented
9
READOUT-04A · NEXT TICK 14:32:13